Sunday, February 12, 2012

Goodness to be

Goodness to be

I am getting very close to having the Blazer ready for springtime wheeling
The gears in the front have been reworked professionally
I've acquired a 2 wheel drive steering box for the crossover/high steer
The frame repair kit is ready to be welded on at the steering box
Custom control arms are designed and being built by myself and my friends at work
I bought some used 15" 8 lug rims
A lot more will be happening soon so stay tuned and watch it unfold





Soon, after more than a year of downtime, The Mutant-Blazer will wheel again.